Hi Community, I have a schedule event configured in the modeler which will fire every day and check for the criteria. If it meets the criteria defined, it will send an email notification. Now I want to change the schedule event interval to 2 hrs. I don't want to goto modeler every time to change the schedule event interval. Is there any way to configure the schedule event interval in the UI? So that I can change easily without any changes in the modeler. Please help me with this. I want the interval to be dynamic and it should be from UI. Any ideas how I can achieve this? Thanks in advance.
↧