Hi,
I installed the calendar widget, the one with the Full Calendar jQuery plugin in my application. When I use the calendar view with scheduler, I can change the start time and end time of a reservation by dragging the meeting. The new timings of a reservation are then also changed in the database. However, this is not possible with dragging a reservation to a different resource. It just jumps right back to the original resource. In other words, it doesn't update the resource change in the database.
Does anyone know how to do this? Or did anyone have the same issue? Thank you in advance.